CLIENT:
Kier
VALUE:
£3.2M
DURATION:
18 Months
DESCRIPTION:
Works included bulk excavation and filling works, concrete foundations and ground floor slabs, drainage, access roads, car parks, footpaths and paving.
Drainage included a 1150m3 1200 dia Ridgistorm XL attenuation tank and Highway Works comprising footpath reconstruction, drainage alterations, tarmac surfacing, road signage and associated traffic management for both section 106 and section 278 works.